Table 1. Estimated Programme Costs per Group for Each Step |
This table outlines our rough estimates of the cost for each step of the program as calculated based on data from one project. From a financial perspective, this cost can be viewed as "overhead" that would need to be amortized over the Group's total production over a defined time period to get the true cost per cubic meter of wood produced. All costs are shown in Kina per Group (1 Kina U.S. $0.75). Transport costs are perhaps higher than average because air travel was required to reach the site. These costs do not include our overhead for running and maintaining the overall programme.
EXPENSE STEP Salaries Transport Equipment Supplies Other 1. Receive Letter from
Landowners100 -- -- -- -- 2. Visit Site and Hold
Proper Village Meeting310 1,200 -- -- -- 3. Have Landowners Write
Letter of Intent100 -- -- -- -- 4. Conduct Quick Survey
of Forest Area250 800 500 -- -- 5. Conduct Formal Survey
of the Forest800 800 600 120 -- 6. Incorporate
Landowners' Group300 800 -- -- 75 7. Develop Agreement
with Group110 400 -- -- -- 8. Train Group and begin
harvesting3,600 3,000 4,700 -- 1,300 9. Develop the Timber Enterprise 800 800 600 120 -- 10. Give Group a Sawmill
on a Trial basis1,800 1,500 10,000 -- -- 11. Assist Group in
Purchasing Equipment550 800 -- 120 -- COLUMN TOTAL 8,120 9,700 15,800 120 1,475 TOTAL PER GROUP 35,215
![]()
![]()
|
|